Location: Leeds

Services: Redesign and full turnkey fit out.

When the consulting engineers Arup commissioned Ultimate to design a scheme for the 3rd floor, we knew we needed to surpass the recently completed schemes on previous floors.

The design incorporated finishes that reflect the materials Arup work with and also the design of the listed building which has coffered ceilings and exposed cast iron beams and columns.

The turnkey solution provided included Interface carpet tiles; acoustic ceiling and wall finishes; moveable partitions, double glazed with integral blinds that allow for a multifunctional meeting. Activity & knowledge sharing space, acoustic stud partitions with magnetic plaster finish; double glazed partitioning & doors. We installed a bespoke tea point, dining island and meeting booths incorporating, timber, laminate, upholstery, AV & power; electronic height adjustable sit stand workstations with double monitor arms with fast charge USB sockets. The breakout furniture with slate effect laminate tables & wood shell chairs in natural & stained finishes were the perfect finishing touches.

Duration: 6 Weeks